PROJECT # 1055.

Jobsite Address: 801 Elbridge Dr. Raleigh NC 27603

Primary Bid Request: Monolithic Slab for Metal Building (1400 SQ FT)

Optional Add-On Bid #2: Construction Entrance: Concrete Apron, Entrance, and Paved Gravel Road

Optional Add-On Bid #3: Erect PEMB Metal Building **NOT a Tube Building**

Your browser does not support PDFs. Download the PDF.

⚠️

Mandatory Site Access & Operational Logistics Directive

Pre-Bid Inspection: Bidder must have appointment in-writing to enter onto the property.

This project is located in a subdivision and in the back yard of the location.

Builder will provide telehandler for use by awarded bidder.

⏱ Work hours are 7am to 6pm Monday through Saturday.

INCO STEEL BUILDINGS
Mailing Address: PO Box 117, Rolesville, NC 27571
Direct Operations Line: (919) 391-7577
Document Identifier: RFB-Form-1055

REQUEST FOR BID / PROPOSALS

⚠️ Attn Bidders: Please provide a turnkey bid for our Primary Requirement (Monolithic Slab Foundation) as soon as possible per the project drawings. Separate, itemized optional pricing must be submitted for Add-On Scopes 2 and 3 if capacity permits.

📋 Project Administrative Coordinates
Date of Issuance:
September 17, 2026
Target Bidder Matrix:
Qualified Bidders
Project Control Number:
Job #: 1055
General Contractor / Builder:
Inco Steel Buildings, Inc.
Project Owner Identification:
___________________________
Project Site Location:
3-Miles Off Highway 42, Raleigh, NC 27603
Environmental & Permit Jurisdiction Status:
Wake County NC Permit Office (Note: The building permit filing has not been started as of the date of this bid request)
📐 Project Development Scope Breakdown

Bidder Requirements, Qualifications & Financial Terms

To maintain uncompromised engineering precision and absolute safety thresholds across the Job #1055 footprint, all responding contracting entities must strictly satisfy the corporate pre-qualification criteria detailed below [1.1]. Proposals from non-vetted or non-compliant firms will be instantly disqualified.

Qualification Category Compliance Allocation Definitive Performance Directives
TIMELINE & DURATION: Mandatory Schedule Bidder must sign, lock in, and guarantee a firm start date and completion date upon contract award. For the Primary Foundation (Bid #1), the bidder explicitly agrees to meet the **11-hour placement/cutting window** and the **24-hour form-strip/drain/backfill execution timeline** detailed in the specifications below.
WORK PERFORMANCE: Subcontracting Ban Subletting or subcontracting any portion of this work is strictly prohibited. All on-site labor must be performed directly by the bidder’s documented W-2 employees to ensure uncompromised safety and quality trackin.
CREDENTIALS & PROFILE: 5-Year Minimum Bidder must possess a minimum of **five (5) years of verifiable experience** directly related to the respective bid descriptions and provide active, verifiable commercial business references upon request.
INSURANCE & COI STATUS: COI Mandate Bidder must maintain active **Commercial General Liability, Workers' Compensation, and Commercial Auto** insurance policies. *Administrative FYI: All Certificates of Insurance (COIs) naming Inco Steel Buildings, Inc. as an additional insured must be emailed directly to:* Office@IncoSteelBuildings.com.
Fidelity Bank NC Financial Accounting & Payout Terms

We issue prompt disbursements exclusively via **bank wire transfers through Fidelity Bank NC**. If your accounting division prefers a corporate physical check or an alternative payout model, you must notify our office and receive formal written approval before commencing any on-site work or staging any materials.

Technical Specifications: Primary Monolithic Slab Foundation

Proposals must be meticulously structured around the definitive target engineering metrics and pour-day operational constraints detailed below. Deviation from these physical or temporal parameters will result in immediate bid rejection.

Engineering Element Required Allocation Definitive Structural Performance Directives
FOOTPRINT DIMENSIONS: 1,400 Total SQ. FT. The foundation pad metrics must span exactly **35' Wide x 40' Length** in strict accordance with the master structural layouts.
SLAB THICKNESS & MIX: 6" Thick / 4000 PSI Reinforced steel monolithic slab structure measuring exactly **6 inches thick**, utilizing site-delivered, certified **4,000 PSI ready-mix concrete**.
PERIMETER FOOTINGS: 12" W x 2'-4" D Continuous perimeter grade-beam footings excavated to a minimum dimensions threshold of **12" wide by 2'-4" deep**.
POUR DAY CONSTRAINTS: 11-Hour Hard Cap **Continuous Placement Window: The contractor must execute the entire continuous slab concrete placement, achieve a hard slick-trowel finish, and complete all soft-cut expansion joints within a hard eleven (11-hour) operational window. This cycle begins precisely at 5:30 AM, synchronized with the concurrent arrival of the pumper truck and the first ready-mix truck.**
DAY 2 SITE WORK: 24-Hour Timeline Within **24 hours of pour completion**, the contractor must completely strip and remove all forms from the site footprint, install the underground perimeter footing drain system per drawing specs, and backfill/compact the exterior perimeter structural edge to final subgrade.
Turnkey Structural Requirement Directive

Technical Specifications: Optional Add-On Project Scopes

Bidders with available field capacity shall provide separate, isolated, and itemized lump-sum pricing for the optional development scopes detailed below. Each optional scope card must be evaluated as an independent turnkey execution segment.

Optional Scope Add-On #2: Site Access, Apron & Paved Gravel Road Civil Add-On
  • Concrete Transition Apron: Measuring exactly 12 feet in width by 4 feet in length spanning from the municipal street edge.
  • Gravel Access Road: Measuring exactly 12 feet in width by 135 feet in length [1.1]. Sourced utilizing **#57 structural clean stone packed to an unyielding 8-inches finished depth**.

👉 Turnkey Requirement: The contractor must file, track, and procure all required **Wake County entrance permits** [1.1]. Provide full civil execution to install a turnkey concrete transition apron and formal entrance cut from the public road right-of-way to the building pad [1.1]. Grade, proof-roll compact, and install the paved gravel access road exactly as outlined on the engineered site/property drawings [1.1].

Optional Scope Add-On #3: Metal Building Erection Labor Erection Add-On
  • Building Framework Profile: Cold-Formed Steel (CFS) pre-engineered engineering building frame [1.1].
  • Structural Framing Dimensions: Exactly **35' Wide x 40' Length x 16' Eave Height** footprint [1.1].

👉 Turnkey ***( LABOR ONLY----BUILDER WILL FURNISH TELEHANDLER FORKLIFT )**** Requirement: Provide 100% of all experienced erection labor, commercial rigging lines, anchoring hardware, and field tools necessary to completely assemble, square, plumb, and anchor the pre-engineered metal building framing skeleton and metal sheeting skins [1.1]. Scope must explicitly include the precise square installation OF ALL DOOR OPENINGS (4), and, weather-flashing, and commercial lockset hardware alignment adjustment of **one (1) 3070 commercial steel personnel man-door unit** [1.1].

Bid Submission, Ledger Commitments & Execution Sign-Off

The responding contractor must completely fill out every financial allocation line and schedule threshold below [1.1]. Submitting this execution card binds your firm to the explicit material and temporal metrics defined within this Job #1055 Request for Proposals [1.1].

Turnkey Financial Proposals Block:
PRIMARY REQUIREMENT — Bid #1 Total (Monolithic Slab Foundation):
$ __________________
Estimated Foundation Project Duration:
Total calendar days from start to cure
OPTIONAL SCOPE — Bid #2 Total (Apron & Gravel Road Access):
$ __________________
OPTIONAL SCOPE — Bid #3 Total (Metal Building Erection Labor):
$ __________________
Guaranteed Timelines & Executive Authorization:
Guaranteed Project Start Date:
Guaranteed Project Completion Date:
Authorized Contractor Executive Signature:
Authorized Company Representative Title & Date Signed